Change the font size
Contacts:
Å-mail: news@rosatom.ru
Vladimir Asmolov, Deputy General Director of JSC “RosEnergoAtom»
Within 12 years FAPP should be operated place-based, and then it is to go to the factory for repair and reloading of nuclear fuel. For the period of its absence at home one should place another FAPP so that it produces there power and covere the energy needs of the territory.
Source: ÍÒÀ-ÏÐÈÂÎËÆÜÅ